Operations Command Center
Capacity Status • Near Capacity (94%)
Real-time monitoring of hospital throughput, bed availability, and discharge bottlenecks. Optimize geometric mean length of stay (GMLOS) to improve capacity and reduce holding times.
94%
2 Beds Available (ICU)
14
Pending Sign-off
0.92
Target: > 0.90
Capacity Blockers
Bed Clean Pending: 4 South
Room 402, 405 waiting > 45 mins.
Updated 5 min ago
Transportation Delay
3 patients waiting for discharge transport.
Updated 12 min ago
Pharmacy Discharge Meds
Batch processing delay in central pharmacy.
Updated 20 min ago
LOS Optimization
Performance Benchmarking •
Average DRG Weight
1.84
Target (GMLOS)
4.8
Product of stays raised to the nth root[cite: 57].
Actual (ALOS)
5.2
Arithmetic mean including outliers[cite: 56].
LOS Index (O/E Ratio)
1.08
Target performance is ≤ 1.00[cite: 59, 93].
✨ SciEncephalon Active LOS Reduction
IV-to-Oral Conversion
Criteria met: Stable vitals & improving labs. Switch reduces costs without increasing mortality[cite: 69, 70].
Physical Therapy Trigger
Automatic PT referral within 24h of admission for pneumonia cohort[cite: 72, 73].